Foxwarren | Flooding Protection

Project

Basement Flooding Protection Program

Location

FOXWARREN DR
From: 61 m West of MILLGATE CRES
To: MILLGATE CRES

Details

Work aimed at the reduction of flooding risk in areas prone to basement flooding. Work may include upgrades to the existing storm sewer system, such as the installation of new pipes, or the replacement of existing pipes with larger pipes, the installation of dry ponds or underground storage tanks, and other improvements to the sewer system. Includes the replacement of the City-owned portion of substandard water service connections. The property owner is encouraged to replace the private portion of the substandard water service connection, as well.

Construction Timeline

Q4 2022 - Q2 2024

Status

Active

Last Updated

Oct 07, 2022.

Project #

27-05

Owner

Toronto Water

Contact

Joseph Pellegrini, Engineering and Construction Services
[email protected]